皇冠官网开户

常州市皇冠娱乐有限公司_皇冠官网开户,3534.com 常州市皇冠娱乐有限公司_皇冠官网开户,3534.com
  About  
  Style  
  Culture  
  Cork history  
  Cork Flooring Using  
  Cork wall application  
 
 
  Technical Support  
  Method of Construction
First of all, ensure all construction surfaces are clean, dry, plain and perfect without damage. Make disorder of original packed wall plates and recombination to obtain even and natural color change effect. If the construction surfaces are too smooth, grind it toughly and remove all spots, old paint. coating and decorations and thoroughly clean the construction surfaces. if much powder exists on the wall. Coat a layer of prime on it.
The wall plates should be stored in a dry place. In order to suit the construction environment. They should be placed on the construction site at least for 48 hours.
Select tip quality glue and make construction as per instructions of the manufacturer. Do not make construction if any surface has the sign of moisture.






Installation of floor
Cork-a kind of living style for top level mankind! Its superior features can determine that it can be covered almost every ground and walls in any interior place
Ground
Priming/adherent bridge Coating roller Filling material Bucket/stirrer  Sand paper 
Cork finished panel 
PE-film Wooden paint  Hammer Stoke base Handle Liner/Laying wedge
Fret saw  Spacing baseboard Maintenance tools for the beginning Maintenance tools for the sequence
Cork panel
Adhesive(1kg/4m2) Coating roller Cutter Metal bus Meter instrument Sand paper(for the firm piled layer) Painting roller Paint(1kg/4m2,for 3 layers’use) Spacing baseboard Suitable maintenance tools


Emulsified contact adhesive D3540 is recommended for the laying cork panel. This kind of free solvent adhesives can be daubed on the back of the panel with the short-nap roller  1. The ground fir the laying panel can be also daubed with such a adhesive. The ground for the laying panel can be also daubed with such a adhesive. The consumption fir the coating if the both sides is about 250g/m2 2. The cork panel and the ground must be ventilated and clear until the both sides are transparent. So the panel can be completely soaked into the bonding layer and the correction can be done through such a contact binding. It is necessary for the film dissolution to be treated with pressure 3.It would be best if the rubber hammer or the clamping roller could be used  4.After that the surface can be treated. There is a detailed laying description in every package.
 
 
百合娱乐app下载bob体育博彩bob体育博彩